Supervisor: Eng. Ahmed Abdullah – Director of The Electrical Services Department at Pi X Company
Execution time : 6 month
Within the time period the land has been leveled and the iron bases for the solar panels has been installed after that comes laying the PVC pipes to protect the cables, lastly the solar panels were mounted on the bases.
The last step was to design and implement a lightning protection network.